Project Photo Gallery

  • SWHS Boiler and Hot Water System

    August 2021 — One of the improvements was installing new boilers on the east end of the A building at Sedro-Woolley High School. The boilers are much smaller than the old steam boilers (located in the gymnasium building across 3rd Street from the main building) and will only heat water instead of making steam, which is much safer and efficient.


  • Big Lake Roof Replacement


  • SWHS Gym Roof Replacement


  • Evergreen Portable Roof Replacement


  • Samish Play Shed

    *This was a partnership between the district and the Samish Parent Group. Many thanks to their fundraising efforts.